Importing data into PDS

From Chemical Engineering @ UP wiki
Revision as of 14:03, 1 November 2009 by 137.215.116.83 (Talk)

Jump to: navigation, search
  • In PDS create a new file (File > New > Model Dev. File > OK).
  • From the Data Operations pull-down menu select Import From Excel.
  • Browse to your data file and click Open.

The Excel file has to have a specific format. The first and second column's headings must be "Date" and "Time" respectively. From the third column onwards variable names are used as column headings in the form VariableName/Var/CV. i.e. 12TT9001.PV/Var/CV, 12TIC9001.SP/Var/MV. The last argument of the variable name headings indicate if the variable is a controlled variable (CV), a manipulated variable (MV) or a disturbance variable (DV). Variable types can be changed in PDS after the import. Under the Date heading the date is entered in the format dd/mm/yyyy and under the Time heading the time is entered in the format hh:mm:ss. The data elements for the variables at the timestamps in the first two columns are entered under their respective headings.

After the import your step test data will be in PDS and the various model identification algorithms can be used to identfiy plant models.