Difference between revisions of "Big distillation column"
(→Operator interface) |
|||
Line 6: | Line 6: | ||
==Control system== | ==Control system== | ||
− | The column is currently controlled making use of the Emerson DeltaV v.14 software. The designed operator interface is shown below. All the control loops can be run either in manual or auto using the selected base-layer control scheme. No APC is currently being employed for process control. | + | The column is currently controlled making use of the Emerson DeltaV v.14 software. The designed operator interface is shown below. All the control loops can be run either in manual or auto using the selected base-layer control scheme. No APC is currently being employed for process control. The PID loops were tuned using InSight, a PID tuning tool in DeltaV |
==Operator interface== | ==Operator interface== | ||
[[Image:8.PNG|center|1000px]] | [[Image:8.PNG|center|1000px]] | ||
+ | ==Instrumentation== | ||
+ | The column has 8 control valves, 8 Coriolis mass flow meters, 19 temperature transmitters, 4 pressure sensors and 3 composition analysers. This gives the column the necessary measurements to ensure control is possible. At the current time, FT-001 gives a negative flow reading and AI-002 does not shine a laser. This is the only known cases of instrumentation that is not working on the column. It is recommended that these problems be addressed. | ||
==Projects== | ==Projects== | ||
=== 2018: Deon Pretorius, Greg Laycock === | === 2018: Deon Pretorius, Greg Laycock === | ||
Line 31: | Line 33: | ||
==Contact persons== | ==Contact persons== | ||
− | For help with the Emerson control system ([[Delta V]]) the contact person as of | + | For help with the Emerson control system ([[Delta V]]) the contact person as of 2019-11 is: |
'''Name''' Daniela Straulino | '''Name''' Daniela Straulino | ||
Line 46: | Line 48: | ||
For other general maintenance concerns and instrumentation problems the contact person is: | For other general maintenance concerns and instrumentation problems the contact person is: | ||
− | '''Name''' | + | '''Name''' Jan Prinsloo |
− | '''Company''' [ | + | '''Company''' [http://www.aveng-acs.com/ Avenge ACS] |
− | '''Cell''' +27- | + | '''Cell''' +27-83-230-4876 |
− | '''E-mail''' | + | '''E-mail''' Jan.Prinsloo@aveng-acs.com |
==Documentation== | ==Documentation== | ||
Line 60: | Line 62: | ||
For help on the Delta V system click [http://www.chem.mtu.edu/chem_eng/current/new_courses/CM4120/2009/Getting%20Started.pdf here]. | For help on the Delta V system click [http://www.chem.mtu.edu/chem_eng/current/new_courses/CM4120/2009/Getting%20Started.pdf here]. | ||
+ | The Guardian services are also available. A username and password can be obtained from Daniela [https://guardian.emerson.com/] |
Revision as of 06:06, 25 November 2019
Contents
Description
The glass distillation column was a donation made by Exxon Mobil in 1978. It is a standard glass distillation column with the main function of distilling ethanol/water mixtures. The column has 10 stages, custom made to include sample points on each stage. The column makes use of donut trays for each stage. Each stage is fitted with an RDT (resistance temperature detector) temperature measurement device. Column instrumentation include various Coriolis mass flow meters and refractive index analyzers. Feed plate 3 and feed plate 6 can be used to feed to the column. This is a closed system with the top product and bottom product being recycled and added to the feed mixing tank.
Control system
The column is currently controlled making use of the Emerson DeltaV v.14 software. The designed operator interface is shown below. All the control loops can be run either in manual or auto using the selected base-layer control scheme. No APC is currently being employed for process control. The PID loops were tuned using InSight, a PID tuning tool in DeltaV
Operator interface
Instrumentation
The column has 8 control valves, 8 Coriolis mass flow meters, 19 temperature transmitters, 4 pressure sensors and 3 composition analysers. This gives the column the necessary measurements to ensure control is possible. At the current time, FT-001 gives a negative flow reading and AI-002 does not shine a laser. This is the only known cases of instrumentation that is not working on the column. It is recommended that these problems be addressed.
Projects
2018: Deon Pretorius, Greg Laycock
Set-up The DeltaV software was updated from version to 9 and 14. This required the old hardware to be removed and new hardware to be installed.
Operator interface The original SASOL graphical user interface was removed and a new user interface was designed and implemented.
Control valve response tuning The control valve responses to set-points were insufficient. The control valve responses were tuned to ensure smooth transition to set-point with no offset or hunting.
Maintenance The following maintenance was completed on the system:
- Substantial leak below reflux drum repaired
- Fouling in reflux line removed
- Some RDT wiring redone
- Some flow indicator wiring redone
- New regulator installed
- New steam trap installed
Base-layer control Initial base-layer control implementation. A reasonable base-layer control scheme postulated and added to the operator interface.
Contact persons
For help with the Emerson control system (Delta V) the contact person as of 2019-11 is:
Name Daniela Straulino
Company Avenge ACS
Tel +27-11-249-6700
Cell +27-82-407-8590
E-mail Daniela.Straulino@avenggroup.com
For other general maintenance concerns and instrumentation problems the contact person is:
Name Jan Prinsloo
Company Avenge ACS
Cell +27-83-230-4876
E-mail Jan.Prinsloo@aveng-acs.com
Documentation
Documentation on past projects that were done on the distillation column can be found here.
Help
For help on the Delta V system click here. The Guardian services are also available. A username and password can be obtained from Daniela [1]