Difference between revisions of "T01 FZG Machine"
m (Use non breaking spaces between numbers and units) |
|||
(12 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | [[File: | + | [[File:FZG_Photo_%282010%29.JPG|500px|right|thumb|The FZG Machine in the Tribology Lab]] |
− | + | ||
== Current/Previous projects == | == Current/Previous projects == | ||
=== 2006 === | === 2006 === | ||
− | + | Hernan Guidi Figueroa and Jabu Thukwana, '''Tribology Laboratory Data Acquisition System and FZG Machine Upgrade'''<br/> | |
[ftp://ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/2006/2332473-guidi_figueroa_h_mr/Document/HernanJabuGroupReport.pdf Report] | [ftp://ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/2006/2332473-guidi_figueroa_h_mr/Document/HernanJabuGroupReport.pdf Report] | ||
− | + | Hernan Guidi Figueroa, '''Initial Modelling and Control of The FZG Machine'''<br/> | |
− | [ftp://ragnarok/publicftp/lab/Tribology/FZG/2006/2332473-guidi_figueroa_h_mr/Document/HernanControlAndModelling.pdf Report] | + | [ftp://ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/2006/2332473-guidi_figueroa_h_mr/Document/HernanControlAndModelling.pdf Report] |
Jabu Thukwana, '''Modeling and Control of the FZG Machine'''<br/> | Jabu Thukwana, '''Modeling and Control of the FZG Machine'''<br/> | ||
− | [ftp://ragnarok/publicftp/lab/Tribology/FZG/2006/2508253-thukwana_aj_mrs/Modelling%20%20and%20Control%20of%20the%20FZG%20test%20rig.pdf Report] | + | [ftp://ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/2006/2508253-thukwana_aj_mrs/Modelling%20%20and%20Control%20of%20the%20FZG%20test%20rig.pdf Report] |
− | + | Hernan Guidi Figueroa and Jabu Thukwana 2006 [ftp://ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/2006/ Project files] | |
=== 2008 === | === 2008 === | ||
Tobi Louw, '''FZG Test Rig Temperature Control Inverse Model Control with Online Parameter Estimation''' <br/> | Tobi Louw, '''FZG Test Rig Temperature Control Inverse Model Control with Online Parameter Estimation''' <br/> | ||
− | [ftp://ragnarok/publicftp/lab/Tribology/FZG/2008/TobiLouw_CML2008.pdf Report] | + | [ftp://ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/2008/TobiLouw_CML2008.pdf Report] |
=== 2010 (Current) === | === 2010 (Current) === | ||
− | Ryan Schultz services the whole machine (New parts ordered from Germany). | + | Ryan Schultz services the whole machine (New parts ordered from Germany). All spare parts are in boxes in the FZG room. Photos of the spare parts and a description of their functionality can be found [ftp://anonymous@ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/2010/FZG%20Photos/ here] or on the [[FZG spares]] page. |
− | + | ||
== Documentation == | == Documentation == | ||
− | The operating instructions for the FZG Machine can be found [ftp://anonymous@ragnarok/publicftp/lab/Tribology/FZG/Documentation/FZG%20Operating%20Instructions.pdf here] | + | The operating instructions for the FZG Machine can be found [ftp://anonymous@ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/Documentation/FZG%20Operating%20Instructions.pdf here] |
− | The FZG Technical Drawings can be found [ftp://anonymous@ragnarok/publicftp/lab/Tribology/FZG/Documentation/FZG%20Technical%20Drawing.pdf here] | + | The FZG Technical Drawings can be found [ftp://anonymous@ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/Documentation/FZG%20Technical%20Drawing.pdf here] |
− | The FZG Wiring Diagrams can be found [ftp://anonymous@ragnarok/publicftp/lab/Tribology/FZG/Documentation/FZG%20Wiring%20Diagram.pdf here] | + | The FZG Wiring Diagrams can be found [ftp://anonymous@ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/Documentation/FZG%20Wiring%20Diagram.pdf here] |
== Test Procedure == | == Test Procedure == | ||
+ | |||
+ | === Standard FZG 12-Stage Load Test === | ||
+ | |||
+ | Download the [ftp://anonymous@ragnarok.up.ac.za/publicftp/lab/Tribology/FZG/FZG%20Test%20Description/BE%40UP%20Tribology%20lab%20Test%20Descriptions%28FZG%29.pdf FZG 12-Stage Load Test Procedure] | ||
+ | |||
+ | The standard FZG 12-stage load test is a test that had been developed for testing gear box oils. It is a dip-lubricated test and is performed on oils. According to DIN 51354 a test gear set (type A) is loaded in stages and run for approximately 15 minutes (21 000 revolutions) at each load stage under specified conditions (A/8,33/90) ie gear type A, circumferential speed of 8,33 m/s and initial sump temperature of 90 °C. The sump is filled with 1,25 litres of the test oil. During each load stage, the sump oil temperature is noted. N.B. No heat is removed (or added) by means of a heating (or cooling) coil during the test, so that the final temperature at the end of each test gives an indication of the frictional energy converted to heat. After each load stage, the gears are removed, left to cool, cleaned, weighed and visually inspected according to the procedure set out in DIN 51354 - 1970. | ||
+ | |||
+ | == Standards and Specifications == | ||
+ | Click [ftp://tribology@ragnarok.up.ac.za/FZG/Standards%20and%20Specifications/ here] to access the specifications of the different FZG test procedures, like DIN51354, IP334 and ISO 14635. A password is required to access these documents. |
Latest revision as of 10:16, 14 September 2010
Contents
Current/Previous projects
2006
Hernan Guidi Figueroa and Jabu Thukwana, Tribology Laboratory Data Acquisition System and FZG Machine Upgrade
Report
Hernan Guidi Figueroa, Initial Modelling and Control of The FZG Machine
Report
Jabu Thukwana, Modeling and Control of the FZG Machine
Report
Hernan Guidi Figueroa and Jabu Thukwana 2006 Project files
2008
Tobi Louw, FZG Test Rig Temperature Control Inverse Model Control with Online Parameter Estimation
Report
2010 (Current)
Ryan Schultz services the whole machine (New parts ordered from Germany). All spare parts are in boxes in the FZG room. Photos of the spare parts and a description of their functionality can be found here or on the FZG spares page.
Documentation
The operating instructions for the FZG Machine can be found here
The FZG Technical Drawings can be found here
The FZG Wiring Diagrams can be found here
Test Procedure
Standard FZG 12-Stage Load Test
Download the FZG 12-Stage Load Test Procedure
The standard FZG 12-stage load test is a test that had been developed for testing gear box oils. It is a dip-lubricated test and is performed on oils. According to DIN 51354 a test gear set (type A) is loaded in stages and run for approximately 15 minutes (21 000 revolutions) at each load stage under specified conditions (A/8,33/90) ie gear type A, circumferential speed of 8,33 m/s and initial sump temperature of 90 °C. The sump is filled with 1,25 litres of the test oil. During each load stage, the sump oil temperature is noted. N.B. No heat is removed (or added) by means of a heating (or cooling) coil during the test, so that the final temperature at the end of each test gives an indication of the frictional energy converted to heat. After each load stage, the gears are removed, left to cool, cleaned, weighed and visually inspected according to the procedure set out in DIN 51354 - 1970.
Standards and Specifications
Click here to access the specifications of the different FZG test procedures, like DIN51354, IP334 and ISO 14635. A password is required to access these documents.